Coal mines and ownership
Find mine projects, owners, development status and separately reported production.
All covered countries: 7,436 retained records. The table below shows the first 100.
Mapped sites use publisher coordinates. Records without site coordinates use a country label point when available; those points are not facility or event locations. Multiple records can share a point.
Select a mapped point to inspect its name and source.
| Country / area | Name / document | Status | Coal grade | Mine type | Capacity · Mt/year | Production · Mt | Production year | Owner | Parent | Start year | Closing year | Source |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| India | Kusmunda Coal Mine | operating | Thermal | Surface | 75 | 50.125 | 2024 | South Eastern Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 1978 | Unavailable | Original record |
| United States | Shawver Operation Mine | operating | Unavailable | Surface | 70 | 0 | 2025 | Hilltop Coal Co [100.0%] | Hilltop Coal Co [100.0%] | 1991 | Unavailable | Original record |
| India | Gevra Coal Mine | operating | Thermal | Surface | 70 | 55.8 | 2025 | South Eastern Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 1981 | Unavailable | Original record |
| United States | Eagle River No. 1 Coal Mine | mothballed | Unavailable | Surface | 65 | 0.01 | 2024 | Responsible Energy Operations [100.0%] | Responsible Energy Operations LLC [100.0%] | 2011 | Unavailable | Original record |
| United States | Carico Ridge Strip Mine | operating | Unavailable | Surface | 56 | 0.01 | 2024 | Big D Enterprises INC [100.0%] | Big D Enterprises Inc [100.0%] | 2001 | Unavailable | Original record |
| Indonesia | Borneo Indobara Coal Mine | operating | Thermal | Surface | 54 | 42.14 | 2023 | PT Borneo Indobara [100.0%] | unknown [1.9%]; PT Golden Energy Mines Tbk [98.1%] | 2005 | 2036 | Original record |
| Indonesia | KPC Operation Coal Mine | operating | Thermal | Surface | 50 | 53.5 | 2023 | PT Kaltim Prima Coal [100.0%] | Tata Power Company Ltd [30.0%]; PT Bumi Resources Tbk [51.0%]; Mountain Netherlands Investments BV [19.0%] | 1991 | 2031 | Original record |
| Australia | Moolarben Coal Mine | operating | Thermal | Underground & Surface | 50 | 37.2 | 2024 | Moolarben Coal Operations [100.0%] | Yancoal Australia Ltd [100.0%] | 2010 | 2038 | Original record |
| Indonesia | Astrindo Gita Mandiri Coal Mine | operating | Thermal | Surface | 50 | 0.008 | 2020 | Astrindo Gita Mandiri [100.0%] | PT Astrindo Gita Mandiri [100.0%] | 2017 | 2036 | Original record |
| Mozambique | Moatize Coal Mine | mothballed | Thermal & Met | Surface | 43 | 11 | 2022 | Vulcan Mozambique SA [100.0%] | Vulcan International | 2011 | Unavailable | Original record |
| United States | Antelope Coal Mine | operating | Thermal | Surface | 42 | 13.66 | 2025 | Navajo Transitional Energy Co LLC [100.0%] | Navajo Transitional Energy Company LLC [100.0%] | 1985 | Unavailable | Original record |
| United States | River Hill Coal Mine | operating | Unavailable | Surface | 42 | 0.01 | 2025 | River Hill Coal Company Inc [100.0%] | River Hill Coal Company Inc [100.0%] | 1950 | Unavailable | Original record |
| United States | Lattimer Division Coal Mine | operating | Unavailable | Surface | 40 | 0 | 2025 | Blaschak Anthracite Corp [100.0%] | Saint Nicholas Investor Group LLC | 1950 | Unavailable | Original record |
| Indonesia | BUK Coal Mine | operating | Thermal | Surface | 40 | 0.01 | 2020 | Berkat Usaha Karya [100.0%] | Berkat Usaha Karya [100.0%] | 2014 | 2030 | Original record |
| India | Integrated Belpahar, Lakhanpur, Lilari Coal Mine | operating | Thermal | Surface | 40 | 32.2 | 2024 | Mahanadi Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | Unavailable | Unavailable | Original record |
| United States | Beech Creek Surface Mine #2 | mothballed | Unavailable | Surface | 40 | 0 | 2025 | FR Performance LLC [100.0%] | FR Performance LLC [100.0%] | 2010 | Unavailable | Original record |
| Kazakhstan | Bogatyr Coal Mine (Kazakhstan) | operating | Thermal | Surface | 40 | 32.53 | 2024 | Bogatyr Komir LLP [100.0%] | En+ Group PJSC [28.4%]; Samruk-Energo JSC [50.0%]; Sual Partners Ltd [6.2%]; small shareholder(s) [9.1%]; Essess Aluminum Holdings Ltd [3.9%]; Isan International Corp [1.4%]; Minorum Holding Ltd [1.0%] | 1970 | Unavailable | Original record |
| China | Zhundong South Surface Mine | operating | Thermal | Surface | 40 | Unavailable | 2023 | Xinjiang Tianchi Energy [100.0%] | Tebian Electric Apparatus [TBEA] [86%]; Xinjiang Joinworld Company [14%] | 2017 | Unavailable | Original record |
| United States | Red Ash Mine No. 1 | operating | Unavailable | Underground | 40 | 0.01 | 2025 | Rayco LLC [100.0%] | Rayco LLC [100.0%] | 2015 | Unavailable | Original record |
| Indonesia | APC Coal Mine | operating | Thermal | Surface | 38 | 0.01 | 2020 | Arimbi Prima Coal [100.0%] | CV Arimbi Prima Coal [100.0%] | 2018 | 2028 | Original record |
| Australia | Centurion Mine | operating | Met | Underground | 37.5 | 0.499 | 2025 | Peabody Energy [100.0%] | Peabody Energy Corp [100.0%] | 2024 | Unavailable | Original record |
| United States | No. 3 Mine | mothballed | Unavailable | Surface | 36 | 0.01 | 2025 | GME Mining & Reclamation Inc [100.0%] | Gme Mining & Reclamation Inc [100.0%] | 2018 | Unavailable | Original record |
| India | Dipka Coal Mine | operating | Thermal | Surface | 35 | 33.44 | 2024 | South Eastern Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 1992 | Unavailable | Original record |
| China | Shenhua Baorixile Surface Coal Mine | operating | Thermal | Surface | 35 | Unavailable | 2025 | China Energy Baorixile Energy Company [100.0%] | China Energy [39%]; Guangda Holding Company [17%]; China National Petroleum Corporation [9%]; Changchun Jijun Trade Company [2%]; Others [33%] | 2001 | Unavailable | Original record |
| China | Shitoumei No.1 Coal Mine | operating | Thermal & Chemical | Surface | 35 | Unavailable | 2025 | Xinjiang Energy Group [100.0%] | Xinjiang Energy Group | Unavailable | Unavailable | Original record |
| China | Baishihu Surface Mine | operating | Thermal & Chemical | Surface | 35 | Unavailable | 2024 | Yiwu Gunaghui Mining Company [100.0%] | Guanghui Energy Holding Company [94%]; Xinjiang Guanghui Industry Investment Group [5%]; Xinjiang Production and Construction Corps [1%] | 2017 | Unavailable | Original record |
| China | Zhundong Surface Mine | operating | Thermal & Chemical | Surface | 35 | Unavailable | 2025 | China Energy Xinjiang Zhundong Energy Company [100.0%] | China Energy | 2016 | Unavailable | Original record |
| Serbia | Bogovina Coal Mine | operating | Thermal | Underground | 35 | 0.0026 | 2024 | JP PEU Resavica [100.0%] | JP PEU Resavica [100.0%] | 1903 | Unavailable | Original record |
| United States | CV30 Mine | mothballed | Unavailable | Surface | 35 | 0.01 | 2024 | Civil LLC [100.0%] | Civil LLC [100.0%] | 2019 | Unavailable | Original record |
| United States | Taylor Lower Bakerstown Mine | mothballed | Unavailable | Surface | 35 | 0.01 | 2025 | Cobra Mining Inc [100.0%] | Cobra Mining Inc [100.0%] | 2013 | Unavailable | Original record |
| United States | Mine No.4 (KY) | operating | Unavailable | Underground | 35 | 0.04 | 2025 | Lighthouse Mining Inc [100.0%] | Lighthouse Mining Inc [100.0%] | 2018 | Unavailable | Original record |
| China | Haerwusu Surface Mine | operating | Thermal | Surface | 35 | Unavailable | 2025 | China Shenhua Energy [100.0%] | China Energy [69%]; HKSCC Nominees Limited [17%]; Others [14%] | 2008 | Unavailable | Original record |
| United States | Catron Mountain Coal Mine | mothballed | Unavailable | Surface | 35 | 0.01 | 2024 | Black Mountain Energy LLC [100.0%] | Black Mountain Energy LLC [100.0%] | 2023 | Unavailable | Original record |
| China | Yimin Surface Mine | operating | Thermal | Surface | 35 | Unavailable | 2025 | Huaneng Yimin Coal and Electricity Company [100.0%] | China Huaneng | 1984 | Unavailable | Original record |
| China | Shenhua Heidaigou Surface Coal Mine | operating | Thermal | Surface | 34 | Unavailable | 2025 | Shenhua Junggar Energy [100.0%] | China Energy [40%]; China Cinda Asset Management Company [42%]; Others [18%] | 1999 | Unavailable | Original record |
| United States | Zerbe 10 Coal Mine | operating | Unavailable | Surface | 34 | 0.01 | 2025 | Fox Coal Company Inc [100.0%] | Fox Coal Co [100.0%] | 2004 | Unavailable | Original record |
| United States | Surface Mine 1 | operating | Unavailable | Surface | 34 | 0.11 | 2025 | Mega Highwall Mining LLC [100.0%] | Mega Highwall Mining LLC [100.0%] | 2022 | Unavailable | Original record |
| Australia | Mount Arthur Coal Mine | operating | Thermal | Surface | 32 | 22.335 | 2024 | Hunter Valley Energy Coal [100.0%] | BHP Group Ltd [100.0%] | 2002 | 2030 | Original record |
| United States | Slope #1 Mine | operating | Unavailable | Underground | 32 | 0 | 2025 | M & D Anthracite Coal [100.0%] | M & D Anthracite Coal Co [100.0%] | 2016 | Unavailable | Original record |
| United States | Still Run Surface Mine No. 1 | mothballed | Unavailable | Surface | 32 | 0 | 2025 | Wyoming Eagle LLC [100.0%] | Wyoming Eagle LLC [100.0%] | 2020 | Unavailable | Original record |
| United States | Corbet South Mine | mothballed | Unavailable | Surface | 32 | 0 | 2025 | RES Coal LLC [100.0%] | Robindale Energy Services Inc | 2018 | Unavailable | Original record |
| United States | Coalbrook Stripping #1 Mine | mothballed | Unavailable | Surface | 32 | 0 | 2025 | Silverbrook Anthracite Inc [100.0%] | Silverbrook Anthracite Inc [100.0%] | 1993 | Unavailable | Original record |
| United States | Big Mountain Anthracite 1 Pit | operating | Unavailable | Surface | 31 | 0.01 | 2024 | Big Mountain Anthracite [100.0%] | Big Mountain Anthracite LLC [100.0%] | 2014 | Unavailable | Original record |
| India | Magadh Coal Mine | proposed | Thermal | Surface | 31 | Unavailable | Unavailable | Central Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 2028 | Unavailable | Original record |
| Mongolia | Tavan Tolgoi Coal Mine | operating | Thermal & Met | Surface | 30.5 | 28.64 | 2024 | Erdenes MGL [100.0%] | Erdenes Mongol LLC [100.0%] | 2011 | Unavailable | Original record |
| United States | Quarry No 2 Mine | operating | Unavailable | Surface | 30 | 0 | 2025 | GMAX Quarry INC [100.0%] | GMAX Quarry Inc [100.0%] | 2010 | Unavailable | Original record |
| United States | Wilson Creek Surface Mines | closed | Unavailable | Surface | 30 | Unavailable | Unavailable | Wilson Creek Energy LLC | Quintana Capital Group GP Ltd | 2010 | 2025 | |
| Indonesia | Mandiri Jaya Makmur Coal Mine | operating | Thermal | Surface | 30 | 0 | 2020 | Mandiri Jaya Makmur [100.0%] | PT Mandiri Jaya Makmur [100.0%] | 2016 | 2026 | Original record |
| China | Shengli East No.2 Coal Mine | proposed | Thermal | Surface | 30 | Unavailable | Unavailable | Inner Mongolia Datang International Xilinhaote Mining Company [100.0%] | China Datang [35.34%]; HKSCC Nominees Limited [32.9%]; Tianjin Energy Investment Group [7%]; Hebei Construction & Investment Group[6.93%]; Beijing Energy [6.81%]; Others [3.27%] | Unavailable | Unavailable | Original record |
| United States | CCU Tuscarawas Strip Mine | operating | Unavailable | Surface | 30 | 0 | 2025 | CCU Coal and Construction LLC [100.0%] | CCU Coal and Construction LLC [100.0%] | 1989 | Unavailable | Original record |
| India | Machhakata Coal Mine | proposed | Thermal | Surface | 30 | Unavailable | Unavailable | NLC India Limited [100.0%] | NLC India Ltd [100.0%] | Unavailable | Unavailable | Original record |
| Indonesia | IKJ Coal Mine | operating | Thermal | Surface | 30 | 0 | 2020 | Indomas Karya Jaya [100.0%] | PT Indomas Karya Jaya [100.0%] | 2010 | 2031 | Original record |
| United States | Surface 4 Coal Mine | mothballed | Unavailable | Surface | 30 | 0.01 | 2025 | Mine Rite Coal Co Inc [100.0%] | Mine Rite Coal Co Inc [100.0%] | 2010 | Unavailable | Original record |
| India | Bhubaneswari Coal Mine | operating | Thermal | Surface | 30 | 26.48 | 2025 | Mahanadi Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 2006 | Unavailable | Original record |
| Serbia | Vrska Cuka Coal Mine | operating | Thermal | Underground | 30 | 0.0041 | 2024 | JP PEU Resavica [100.0%] | JP PEU Resavica [100.0%] | 1912 | Unavailable | Original record |
| India | Jayant Coal Mine | operating | Thermal | Surface | 30 | 30 | 2025 | Northern Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 1975 | Unavailable | Original record |
| Indonesia | Marlin Serantau Alam Coal Mine | operating | Thermal | Surface | 30 | 0.04 | 2020 | Marlin Serantau Alam [100.0%] | PT Marlin Serantau Alam [100.0%] | 2009 | 2028 | Original record |
| China | Jiangjun Gebi No. 2 Coal Mine | operating | Thermal & Chemical | Surface | 30 | Unavailable | 2025 | Xinjiang Tianchi Energy [100.0%] | Tebian Electric Apparatus [TBEA] [86%]; Xinjiang Joinworld Company [14%] | 2018 | Unavailable | Original record |
| China | Hongshaquan No. 1 Surface Mine | operating | Thermal | Surface | 30 | Unavailable | 2025 | China Energy Xinjiang Hongshaquan Energy Company [100.0%] | China Energy | 2018 | Unavailable | Original record |
| China | Shengli No.1 Open-Pit Coal Mine | operating | Thermal | Surface | 28 | Unavailable | 2025 | China Energy Beidian Shengli Energy [100.0%] | China Energy [46%]; China Huaneng[26%]; Others[28%] | 2013 | Unavailable | Original record |
| Australia | Mt Thorley Warkworth Coal Mine | operating | Thermal & Met | Surface | 28 | 17.2 | 2024 | Coal & Allied [100.0%] | Yancoal Australia Ltd [100.0%] | 1981 | 2037 | Original record |
| Indonesia | DMP Coal Mine | operating | Thermal | Surface | 28 | 0 | 2020 | Dayak Membangun Pratama [100.0%] | PT Black Diamond Resources Tbk [99.1%] | 2011 | 2031 | Original record |
| China | Shenhua Bulianta Coal Mine | operating | Thermal | Underground | 28 | Unavailable | 2024 | China Shenhua Energy [100.0%] | China Energy [69%]; HKSCC Nominees Limited [17%]; Others [14%] | 1997 | Unavailable | Original record |
| Iran | Gol Banu Coal Mine | operating | Thermal | Underground | 28 | 0 | Unavailable | Gol Banoo Coal Mine Cooperative Company [100.0%] | Gol Banoo Coal Mine Cooperative Co [100.0%] | Unavailable | Unavailable | Original record |
| United States | Auger 11 Coal Mine | mothballed | Unavailable | Surface | 27 | 0 | 2024 | Gary Gioia Coal Co [100.0%] | Gary Gioia Coal Co [100.0%] | 2024 | Unavailable | Original record |
| India | Dudhichua Coal Mine | operating | Thermal | Surface | 25.5 | 9.27 | 2024 | Northern Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 1982 | Unavailable | Original record |
| United States | Pocahontas Highwall Mine | operating | Unavailable | Surface | 25 | 0 | 2025 | Pocahontas Coal Company LLC [100.0%] | Metinvest BV | 2005 | Unavailable | Original record |
| United States | Slope #2 Mine | operating | Unavailable | Underground | 25 | 0 | 2025 | S & J Coal Mine [100.0%] | S & J Coal Mine Inc [100.0%] | 2011 | Unavailable | Original record |
| India | Utkal A Coal Mine | proposed | Thermal | Surface | 25 | Unavailable | Unavailable | Mahanadi Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 2027 | Unavailable | Original record |
| United States | Blue Ridge Coal Mine | operating | Unavailable | Surface | 25 | 0 | 2025 | Blue Ridge Mining [100.0%] | Blue Ridge Mining Inc [100.0%] | Unavailable | Unavailable | Original record |
| China | Tashan Coal Mine | operating | Thermal | Underground | 25 | Unavailable | 2023 | Datong Datang Tashan Coal Mining Company [100.0%] | Jinneng Group [41%]; China Datang [9%]; HKSCC Nominees Limited [9%]; Others [41%] | 2008 | Unavailable | Original record |
| China | Shaanxi Caojiatan Coal Mine | operating | Thermal | Underground | 25 | Unavailable | 2024 | Shaanxi Coal Caojiatan Mining Company [100.0%] | Shaanxi Coal and Chemical Industry Group [51%]; Shaanxi Financial Holding Group [23%]; Yulin City Yuyang District Energy Investment Company [12%]; Yulin State-Owned Asset Operation and Management Company [8%]; Shenmu County State-Owned Asset Management Company [5%] | 2020 | Unavailable | Original record |
| India | Subhadra Coal Mine | proposed | Thermal | Surface | 25 | Unavailable | Unavailable | Mahanadi Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 2029 | Unavailable | Original record |
| China | Pingshuo East Coal Mine | operating | Thermal | Surface | 25 | Unavailable | 2024 | China Coal Pingshuo Group [100.0%] | China Coal [57%]; HKSCC Nominees Limited [30%]; Others [13%] | 2016 | Unavailable | Original record |
| United States | Fieg Bros Coal Mine | operating | Unavailable | Surface | 25 | 0 | 2025 | Fieg Bros Coal Co [100.0%] | Fieg Bros Coal Co [100.0%] | 1987 | Unavailable | Original record |
| Indonesia | Indra Berjaya Coal Mine | closed | Thermal | Surface | 25 | 0.03 | 2020 | Indra Berjaya | Indra Berjaya | 2015 | 2020 | |
| India | Pirpainti Barahat Coal Mine | proposed | Thermal | Surface | 25 | Unavailable | Unavailable | Damodar Valley Corporation [100.0%] | Damodar Valley Corp [100.0%] | Unavailable | Unavailable | Original record |
| China | Anjialing Open-Pit Mine | operating | Thermal & Chemical | Surface | 25 | Unavailable | 2024 | China Coal Pingshuo Group [100.0%] | China Coal [57%]; HKSCC Nominees Limited [30%]; Others [13%] | 2006 | Unavailable | Original record |
| China | Dabaodang Coal Mine | proposed | Chemical | Underground | 25 | Unavailable | Unavailable | Guoneng Shaanxi Yushen Mining Co Ltd [100.0%] | Unavailable | Unavailable | Unavailable | Original record |
| India | Amrapali Coal Mine | operating | Thermal | Surface | 24.19 | 16.46 | 2025 | Central Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 2014 | Unavailable | Original record |
| United States | Wymps Gap Surface Coal Mine | operating | Unavailable | Surface | 24 | 0 | 2025 | Charles L Swenglish & Sons Inc [100.0%] | PT Cereno Energi Selaras [100.0%] | 1977 | Unavailable | Original record |
| Indonesia | Limbuh Coal Mine | mothballed | Thermal | Surface | 24 | 0.002 | 2020 | Limbuh [100.0%] | Limbuh [100.0%] | 2016 | 2026 | Original record |
| United States | Low Gap Surface Mine | mothballed | Unavailable | Surface | 23.8 | 0 | 2025 | Extra Energy Inc [100.0%] | Extra Energy Inc [100.0%] | 1978 | Unavailable | Original record |
| India | Rajmahal Coal Mine | operating | Thermal | Surface | 23.8 | 14.01 | 2025 | Eastern Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 1988 | Unavailable | Original record |
| India | Gare Palma II Coal Mine | operating | Thermal | Surface | 23.6 | Unavailable | Unavailable | Maharashtra State Power Generation Co Ltd [100.0%] | MSEB Holding Co Ltd [100.0%] | 2026 | Unavailable | Original record |
| United States | Long Fork Surface No.12 Mine | operating | Unavailable | Surface | 23.6 | 0.01 | 2025 | Clintwood JOD LLC [100.0%] | JOD Holdings LLC | 2017 | Unavailable | Original record |
| Australia | Ravensworth Coal Mine | operating | Thermal | Surface | 23 | 12.8 | 2024 | Ravensworth Operations Pty Limited [100.0%] | Glencore PLC [100.0%] | 1972 | 2039 | Original record |
| United States | Highwall Miner 2 Mine | mothballed | Unavailable | Surface | 22.5 | 0 | 2025 | CKJ Enterprises Inc [100.0%] | CKJ Enterprises Inc [100.0%] | 2019 | Unavailable | Original record |
| United States | #2 Surface Mine | mothballed | Unavailable | Surface | 22 | 0 | 2024 | Ambrose Branch Coal Company Inc [100.0%] | Ambrose Branch Coal Company Inc [100.0%] | 2011 | Unavailable | Original record |
| United States | Choctaw Mine Coal Mine | operating | Unavailable | Surface | 22 | 0 | 2025 | Iron Eagle Land Rehabilitation LLC [100.0%] | Iron Eagle Land Rehabilitation LLC [100.0%] | Unavailable | Unavailable | Original record |
| Australia | Mount Pleasant Coal Mine | operating | Thermal | Surface | 21 | 11.4 | 2024 | Mach Energy [100.0%] | Droxford International Ltd | 2018 | 2048 | Original record |
| New Zealand | Cascade Coal Mine | closed | Met | Surface | 21 | 0 | Unavailable | Bathurst Resources | Bathurst Resources [100%] | Unavailable | 2020 | |
| India | Garjanbahal Coal Mine | operating | Thermal | Surface | 20.21 | 18.2 | 2025 | Mahanadi Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | Unavailable | Unavailable | Original record |
| Indonesia | PW Coal Mine | operating | Thermal | Surface | 20.16 | 0 | Unavailable | Pasir Walannae [100.0%] | PT Pasir Walannae [100.0%] | 2018 | Unavailable | Original record |
| India | Bhubaneswari Coal Mine | proposed | Thermal | Surface | 20 | Unavailable | Unavailable | Mahanadi Coalfields Ltd [100.0%] | Coal India Ltd [100.0%] | 2031 | Unavailable | Original record |
| India | Talabira II & III Coal Mines | operating | Thermal | Surface | 20 | 17.2 | 2024 | NLC India Ltd [100.0%] | NLC India Ltd [100.0%] | 2018 | Unavailable | Original record |
| United States | #1 Strip Mine | operating | Unavailable | Surface | 20 | 0 | 2025 | Pine Mountain Coal Company Inc [100.0%] | Pine Mountain Coal Company Inc [100.0%] | 1976 | Unavailable | Original record |
| China | Changtan Surface Coal Mine | proposed | Thermal | Surface | 20 | Unavailable | 2023 | Inner Mongolia Huineng Coal and Electricity Group [100.0%] | Beijing Huayuan Jiaxin Investment Company | Unavailable | Unavailable | Original record |
| China | Huolinhe South Surface Mine | operating | Thermal | Surface | 20 | Unavailable | 2023 | Inner Mongolia Huolinhe Open-Pit Coal Industry Company [100.0%] | State Power Investment Corporation [SPIC] [39%]; Huolinhe Coal Industry Group [26%]; Others [35%] | 1984 | Unavailable | Original record |
| India | Ghogharpalli & Its Dip Extension Block Summary | proposed | Thermal | Underground & Surface | 20 | Unavailable | Unavailable | Vedanta Ltd [100.0%] | Vedanta Ltd [100.0%] | Unavailable | Unavailable | Original record |
Download country records (JSON) · Download country records (CSV) · Coverage and definitions
Explore covered commodity suppliers and trade for this country →
Coverage and interpretation
Rows represent GEM coal mine projects. The tracker prioritizes mines of at least 1 million tonnes/year, or 0.45 million in China; smaller mines are discretionary. Closed mines are tracked since 2015. Production and capacity are separate, and production years differ by mine. Multiple projects can share an operation.
JSON downloads contain retained records for the selected country, including records outside the current filters. Complete-explorer CSV downloads contain all covered countries. New source snapshots are checked and reviewed separately before publication.
Source: Global Energy Monitor · CC BY 4.0. Source period: August 2026 release. World Signal Monitor adapted the selection, navigation and maps; no publisher endorsement is implied. File checksums · Source URLs, retrieval dates and hashes