Power plant development
Explore operating, proposed, building and retired power units across eight technologies.
United States: 17,243 retained records. The table below shows the first 100.
Mapped sites use publisher coordinates. Records without site coordinates use a country label point when available; those points are not facility or event locations. Multiple records can share a point.
Select a mapped point to inspect its name and source.
| Name / document | Unit | Technology | Status | Capacity · MW | Start year | Retirement year | Owner | Parent | Location accuracy | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| Portsmouth Powered Land Project | 1 | oil/gas | announced | 9,200 | 2028 | Unavailable | SB Energy Corp [50%]; SoftBank Group Corp [50%] | small shareholder(s) [45.3%]; natural person(s) [16.4%]; SoftBank Group Corp [16.4%]; Mitsubishi UFJ Financial Group Inc [7.7%]; Nippon Life Insurance Co [5.5%]; Sumitomo Mitsui Trust Group [2.2%]; Mizuho Financial Group Inc [1.8%]; Meiji Yasuda Life Insurance Co [1.7%]; Norinchukin Bank [1.7%]; Resonac Holdings Corp [1.1%]; Asahi Mutual Life Insurance Co [0.3%] | exact | Original record |
| GW Ranch Energy Center | 2 | oil/gas | pre-construction | 6,342 | 2027 | Unavailable | Pacifico GW LLC [100%] | Pacifico Energy Group LLC [100.0%] | exact | Original record |
| Power Pleasant Campus power station | Phase 2 | oil/gas | pre-construction | 6,000 | 2031 | Unavailable | Monarch Cloud Campus LLC [100%] | Nscale Global Holdings Ltd [100.0%] | exact | Original record |
| Nextera-Comstock power station | 1 | oil/gas | announced | 5,200 | 2027 | Unavailable | Comstock Resources Inc [50%]; NextEra Energy Inc [50%] | Comstock Resources Inc [50.0%]; NextEra Energy Inc [50.0%] | approximate | Original record |
| Project South Mon power station | 1 | oil/gas | announced | 4,300 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Nathaniel Washington hydroelectric plant | Unavailable | hydropower | operating | 4,215 | 1975 | Unavailable | US Bureau of Reclamation [100%] | Unavailable | exact | Original record |
| Big Canyon Pumped Storage hydroelectric plant | Unavailable | hydropower | cancelled | 3,600 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Pittsylvania power station | 1 | oil/gas | cancelled | 3,500 | Unavailable | Unavailable | Balico LLC [100%] | Balico LLC [100.0%] | approximate | Original record |
| Nexus Hubbard power plant | CC5 | oil/gas | pre-construction | 3,066 | 2027 | Unavailable | Nexus Hubbard Power LLC [100%] | Nexus Hubbard Power LLC [100.0%] | exact | Original record |
| STAK Energy Campus | 1 | oil/gas | pre-construction | 3,000 | 2028 | Unavailable | Stak Energy Corporation [100%] | Stak Energy Corporation [100.0%] | exact | Original record |
| Red Lake Pumped hydroelectric plant | Unavailable | hydropower | announced | 3,000 | Unavailable | Unavailable | Gravity Storage LLC | Unavailable | approximate | Original record |
| Stratos Project power station | 1 | oil/gas | announced | 3,000 | Unavailable | Unavailable | Westgen Pty Ltd [100%] | Westgen Pty Ltd [100.0%] | approximate | Original record |
| TECfusions Keystone Connect power station | 1 | oil/gas | announced | 3,000 | 2031 | Unavailable | TECfusions Inc [100%] | TECfusions Inc [100.0%] | approximate | Original record |
| Bath County hydroelectric plant | Unavailable | hydropower | operating | 2,862 | 1985 | Unavailable | LS Power Development LLC [40%]; Dominion Energy Inc [60%] | Unavailable | exact | Original record |
| Clean Hydrogen Works LA-2 Facility | 1 | oil/gas | pre-construction | 2,740 | 2030 | Unavailable | Clean Hydrogen Works LA-2 LLC [100%] | Clean Hydrogen Works LA-2 LLC [100.0%] | approximate | Original record |
| Schlachter Realty Data Center Power Station | 1 | oil/gas | pre-construction | 2,673 | 2028 | Unavailable | Schlachter Realty Ltd [100%] | Schlachter Realty Ltd [100.0%] | exact | Original record |
| Halverson Canyon hydroelectric plant | Unavailable | hydropower | cancelled | 2,650 | Unavailable | Unavailable | Daybreak Power Inc [100%] | Unavailable | exact | Original record |
| Coastal Virginia Offshore Wind (CVOW) Commercial Project | 1 | wind | construction | 2,640 | 2027 | Unavailable | Dominion Energy Inc [50%]; Stonepeak Partners LP [50%] | Unavailable | exact | Original record |
| SunZia Wind | South | wind | construction | 2,561.2 | 2026 | Unavailable | Pattern Energy [100%] | Unavailable | exact | Original record |
| Kilby power plant | Expansion | oil/gas | announced | 2,500 | Unavailable | Unavailable | Energy Forge One LLC [100%] | Energy Forge One LLC [100.0%] | exact | Original record |
| Kitty Hawk wind farm | 2 | wind | pre-construction | 2,465 | Unavailable | Unavailable | Avangrid Renewables [100%] | Unavailable | approximate | Original record |
| Adams Fork Data Center Energy Campus | 1 | oil/gas | pre-construction | 2,457 | 2027 | Unavailable | TransGas Development Systems LLC [100%] | TransGas Development Systems LLC [100.0%] | exact | Original record |
| Adams Fork Harless Data Center Energy Campus | 1 | oil/gas | pre-construction | 2,457 | 2027 | Unavailable | TransGas Development Systems LLC [100%] | TransGas Development Systems LLC [100.0%] | exact | Original record |
| Chief Joseph hydroelectric plant | Unavailable | hydropower | operating | 2,456 | 1955 | Unavailable | US Army Corps of Engineers - Seattle District [100%] | Unavailable | exact | Original record |
| Robert Moses Niagara hydroelectric plant | Unavailable | hydropower | operating | 2,429 | 1961 | Unavailable | New York Power Authority [100%] | Unavailable | exact | Original record |
| Dove Creek Technology Campus power station | 1 | oil/gas | pre-construction | 2,400 | 2028 | Unavailable | Westline TX Holding LLC [100%] | Westline TX Holding LLC [100.0%] | exact | Original record |
| Leading Light Wind | 1 | wind | pre-construction | 2,400 | 2031 | Unavailable | energyRE; Invenergy LLC | Unavailable | approximate | Original record |
| Black Mesa Pumped Storage South hydroelectric plant | Unavailable | hydropower | cancelled | 2,250 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Black Mesa Pumped Storage North hydroelectric plant | Unavailable | hydropower | cancelled | 2,250 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Chill Sun Solar Project | Unavailable | utility-scale solar | cancelled | 2,250 | Unavailable | Unavailable | Naturgy Energy Group SA [100%] | Unavailable | exact | Original record |
| Navajo Energy Storage Station hydroelectric plant | Unavailable | hydropower | shelved | 2,210 | Unavailable | Unavailable | Daybreak Power Inc | Unavailable | approximate | Original record |
| John Day hydroelectric plant | Unavailable | hydropower | operating | 2,160 | 1968 | Unavailable | US Army Corps of Engineers - Portland District [100%] | Unavailable | exact | Original record |
| Power Pleasant Campus power station | EU1-EU864 (Phase 1) | oil/gas | pre-construction | 2,160 | 2027 | Unavailable | Monarch Cloud Campus LLC [100%] | Nscale Global Holdings Ltd [100.0%] | exact | Original record |
| Liberty wind farm (United States) | 1 | wind | pre-construction | 2,143 | Unavailable | Unavailable | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners P/S [50%] | Unavailable | approximate | Original record |
| Gregory County hydroelectric plant | Unavailable | hydropower | cancelled | 2,100 | Unavailable | Unavailable | Unavailable | Unavailable | exact | Original record |
| Montezuma Pumped Storage hydroelectric plant | Unavailable | hydropower | cancelled | 2,100 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| SPS 2023 IRP power plants | 1 IRP | oil/gas | pre-construction | 2,088 | 2029 | Unavailable | Southwestern Public Service Co [100%] | Xcel Energy Inc [100.0%] | approximate | Original record |
| Hoover Dam hydroelectric plant | Unavailable | hydropower | operating | 2,080 | 1936 | Unavailable | US Bureau of Reclamation [100%] | Unavailable | exact | Original record |
| Fort Martin power station | Unit 3 | oil/gas | shelved | 2,000 | Unavailable | Unavailable | Monongahela Power Co [100%] | FirstEnergy Corp [100.0%] | exact | Original record |
| Cascadia Offshore Wind Project | 1 | wind | shelved | 2,000 | Unavailable | Unavailable | Hecate Energy [100%] | Unavailable | approximate | Original record |
| Lea County power station | Phase 1 | oil/gas | announced | 2,000 | 2028 | Unavailable | New Era Energy & Digital Inc [100%] | New Era Energy & Digital Inc [100.0%] | approximate | Original record |
| Olympic Wind | 1 | wind | pre-construction | 2,000 | 2030 | Unavailable | Trident Winds [100%] | Unavailable | approximate | Original record |
| Crow Nation CFB | Unavailable | coal | cancelled | 2,000 | Unavailable | Unavailable | Crow Nation [50%]; Westmoreland Mining LLC [50%] | Crow Nation [50.0%]; Westmoreland Mining Holdings LLC [50.0%] | approximate | Original record |
| Vermaland La Osa power station | 1 | oil/gas | announced | 2,000 | Unavailable | Unavailable | Vermaland LLC [100%] | Vermaland LLC [100.0%] | approximate | Original record |
| Isabella Pumped Storage hydroelectric plant | Unavailable | hydropower | pre-construction | 2,000 | Unavailable | Unavailable | Premium Energy | Unavailable | approximate | Original record |
| Escondido Canyon Pumped hydroelectric plant | Unavailable | hydropower | announced | 2,000 | Unavailable | Unavailable | Gravity Storage LLC | Unavailable | approximate | Original record |
| Bad Creek hydroelectric plant | Unavailable | hydropower | operating | 2,000 | 1991 | Unavailable | Duke Energy Carolinas LLC [100%] | Unavailable | exact | Original record |
| Big Chino hydroelectric plant | Unavailable | hydropower | cancelled | 2,000 | Unavailable | Unavailable | ITC Holdings Corp [100%] | Unavailable | approximate | Original record |
| Walker Lake Pumped Storage hydroelectric plant | Unavailable | hydropower | shelved | 2,000 | Unavailable | Unavailable | Premium Energy | Unavailable | approximate | Original record |
| Creekstone Gigasite Data Center power station | 1 | oil/gas | pre-construction | 2,000 | 2030 | Unavailable | Creekstone Energy LLC [100%] | Creekstone Energy LLC [100.0%] | approximate | Original record |
| Seminoe Power Project | 1 | oil/gas | pre-construction | 2,000 | 2028 | Unavailable | Anschutz Corp [100%] | Anschutz Corp [100.0%] | approximate | Original record |
| Pyramid Lake Pumped Storage hydroelectric plant | Unavailable | hydropower | pre-construction | 2,000 | Unavailable | Unavailable | Premium Energy | Unavailable | approximate | Original record |
| Harrison power station | Unit 4 | oil/gas | shelved | 2,000 | Unavailable | Unavailable | Monongahela Power Co [100%] | FirstEnergy Corp [100.0%] | exact | Original record |
| Ludington hydroelectric plant | Unavailable | hydropower | operating | 1,979 | 1973 | Unavailable | Consumers Energy Co [51%]; DTE Electric Co [49%] | Unavailable | exact | Original record |
| ABI-1 Electric Generating Unit power plant | 2 | oil/gas | pre-construction | 1,868 | Unavailable | Unavailable | VoltaGrid LLC [100%] | Canada Pension Plan Investment Board [33.3%]; Longbow Capital Inc [33.3%]; natural person(s) [33.3%] | exact | Original record |
| Midland cogeneration Venture | 1 | oil/gas | operating | 1,849 | 1998 | Unavailable | Midland Cogeneration Venture LP [100%] | Capital Power Investments LLC [50.0%] | exact | Original record |
| The Dalles hydroelectric plant | Unavailable | hydropower | operating | 1,820 | 1957 | Unavailable | US Army Corps of Engineers - Portland District [100%] | Unavailable | exact | Original record |
| Kingsboro NetZero Data Center power station | 1 | oil/gas | pre-construction | 1,800 | 2029 | Unavailable | Energy Storage Solutions LLC [100%] | North Carolina Renewable Energy LLC [100.0%] | exact | Original record |
| Dry Canyon Pumped Storage hydroelectric plant | Unavailable | hydropower | pre-construction | 1,800 | Unavailable | Unavailable | PacifiCorp | Unavailable | approximate | Original record |
| Greensville County power station | GV01 | oil/gas | operating | 1,773 | 2018 | Unavailable | Virginia Electric and Power Co [100%] | Dominion Energy Inc [100.0%] | exact | Original record |
| Project Horizon power station | 2 | oil/gas | announced | 1,750 | Unavailable | Unavailable | CoreWeave Inc [100%] | small shareholder(s) [70.3%]; Supernova Management LLC [17.1%]; Jane Street Group LLC [6.5%]; The Vanguard Group Inc [5.8%]; Blackrock Advisors LLC [0.3%] | approximate | Original record |
| Okeechobee Clean energy center | CC1 | oil/gas | operating | 1,723 | 2019 | Unavailable | Florida Power & Light Co [100%] | NextEra Energy Inc [100.0%] | exact | Original record |
| Fort Myers power station | F901 | oil/gas | operating | 1,722 | 2001 | Unavailable | Florida Power & Light Co [100%] | NextEra Energy Inc [100.0%] | exact | Original record |
| Raccoon Mountain hydroelectric plant | Unavailable | hydropower | operating | 1,714 | 1978 | Unavailable | Tennessee Valley Authority (TVA) [100%] | Unavailable | exact | Original record |
| Amarillo nuclear power plant | 1 | nuclear | cancelled | 1,710 | Unavailable | Unavailable | Amarillo Power [100%] | Unavailable | approximate | Original record |
| Amarillo nuclear power plant | 2 | nuclear | cancelled | 1,710 | Unavailable | Unavailable | Amarillo Power [100%] | Unavailable | approximate | Original record |
| Comanche Peak nuclear power plant | 3 | nuclear | cancelled | 1,700 | Unavailable | Unavailable | Luminant Generation Company LLC [100%] | Unavailable | exact | Original record |
| Comanche Peak nuclear power plant | 4 | nuclear | cancelled | 1,700 | Unavailable | Unavailable | Luminant Generation Company LLC [100%] | Unavailable | exact | Original record |
| Alpha Digital Campus Power Plant | expansion | oil/gas | announced | 1,700 | 2027 | Unavailable | Liberty Power Innovations LLC [100%] | Liberty Energy Inc [100.0%] | approximate | Original record |
| Castaic hydroelectric plant | Unavailable | hydropower | operating | 1,682 | 1972 | Unavailable | California Department of Water Resources; Los Angeles Department of Water & Power (LADWP) | Unavailable | exact | Original record |
| Lake Charles Wind Energy Area | 1 | wind | announced | 1,659 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Galveston Wind Energy Area | 1 | wind | shelved | 1,659 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Ridgeline Facility power station | 1 | oil/gas | pre-construction | 1,656 | 2027 | Unavailable | Fundamental Data LLC [100%] | Fundamental Data LLC [100.0%] | exact | Original record |
| Fresno nuclear power plant | 2 | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Fresno Nuclear Energy Group LLC [100%] | Unavailable | approximate | Original record |
| Idaho Energy Complex nuclear power plant | Unavailable | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Alternate Energy Holdings INC (AEHI) [100%] | Unavailable | approximate | Original record |
| Fermi nuclear power plant | 3 | nuclear | cancelled | 1,600 | Unavailable | Unavailable | DTE Electric Co [100%] | Unavailable | exact | Original record |
| Fresno nuclear power plant | 1 | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Fresno Nuclear Energy Group LLC [100%] | Unavailable | approximate | Original record |
| Southern Ohio Clean Energy Park nuclear power plant | Unavailable | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Duke Energy Corp [100%] | Unavailable | approximate | Original record |
| Calvert Cliffs nuclear power plant | 3 | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Unistar Nuclear Energy LLC [100%] | Unavailable | exact | Original record |
| Canopy Offshore wind farm | 1 | wind | pre-construction | 1,600 | Unavailable | Unavailable | RWE Renewables [100%] | Unavailable | approximate | Original record |
| Callaway nuclear power plant | 2A | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Ameren UE [100%] | Unavailable | exact | Original record |
| Piketon nuclear power plant | 1 | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Duke Energy Corp [100%] | Unavailable | exact | Original record |
| Cape Station geothermal power plant | future units | geothermal | announced | 1,600 | Unavailable | Unavailable | Fervo Energy | Unavailable | exact | Original record |
| Bell Bend nuclear power plant | Unavailable | nuclear | cancelled | 1,600 | Unavailable | Unavailable | PPL Corp [100%] | Unavailable | exact | Original record |
| Nine Mile Point nuclear power plant | 3 | nuclear | cancelled | 1,600 | Unavailable | Unavailable | Niagara Mohawk Power Co [100%] | Unavailable | exact | Original record |
| Chandler Mountain hydroelectric plant | Unavailable | hydropower | cancelled | 1,600 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Galveston Wind Energy Area | 2 | wind | shelved | 1,567 | Unavailable | Unavailable | RWE AG | Unavailable | approximate | Original record |
| Victoria County nuclear power plant | 2 | nuclear | cancelled | 1,535 | Unavailable | Unavailable | Exelon Nuclear Texas Holdings LLC [100%] | Unavailable | exact | Original record |
| Victoria County nuclear power plant | 1 | nuclear | cancelled | 1,535 | Unavailable | Unavailable | Exelon Nuclear Texas Holdings LLC [100%] | Unavailable | exact | Original record |
| Grand Gulf nuclear power plant | 3 | nuclear | cancelled | 1,520 | Unavailable | Unavailable | Entergy Corp [100%] | Unavailable | exact | Original record |
| River Bend nuclear power plant | 3 | nuclear | cancelled | 1,520 | Unavailable | Unavailable | Gulf States Utilities Co [100%] | Unavailable | exact | Original record |
| Brunswick County power station | BC01 | oil/gas | operating | 1,511.5 | 2016 | Unavailable | Virginia Electric and Power Co [100%] | Dominion Energy Inc [100.0%] | exact | Original record |
| Atlantic Shores South Wind Project | 1 | wind | pre-construction | 1,510 | 2027 | Unavailable | Shell Group Inc; EDF Renewables | Unavailable | approximate | Original record |
| Prometheus Hyperscale power station | Phase 1 | oil/gas | announced | 1,500 | Unavailable | Unavailable | Prometheus Hyperscale Corp [100%] | Prometheus Hyperscale Corp [100.0%] | approximate | Original record |
| Black Mesa Pumped Storage East hydroelectric plant | Unavailable | hydropower | cancelled | 1,500 | Unavailable | Unavailable | Unavailable | Unavailable | approximate | Original record |
| Desert Rock | Unavailable | coal | cancelled | 1,500 | Unavailable | Unavailable | Desert Rock Energy Company LLC [50%]; Diné Power Authority [50%] | Desert Rock Energy Company LLC [50.0%]; Diné Power Authority [50.0%] | approximate | Original record |
| NRG Data Center power station 3 | 1 | oil/gas | pre-construction | 1,500 | 2030 | Unavailable | NRG Energy Inc [100%] | NRG Energy Inc [100.0%] | approximate | Original record |
| NRG Data Center power station 4 | 1 | oil/gas | pre-construction | 1,500 | 2032 | Unavailable | NRG Energy Inc [100%] | NRG Energy Inc [100.0%] | approximate | Original record |
| Norton Pumped Storage hydroelectric plant | Unavailable | hydropower | pre-construction | 1,500 | Unavailable | Unavailable | Norton Pump Storage LLC | Unavailable | approximate | Original record |
| Surry County power station | Unavailable | coal | cancelled | 1,500 | Unavailable | Unavailable | Old Dominion Electric Cooperative [100%] | Old Dominion Electric Cooperative [100.0%] | approximate | Original record |
Download country records (JSON) · Download country records (CSV) · Coverage and definitions
Explore covered commodity suppliers and trade for this country →
Coverage and interpretation
One row per GEM unit or phase, not one per physical site. Source thresholds vary by technology; distributed solar is not comprehensively mapped. Capacity is MW, not generated electricity. Proposed start years are plans. End-year is reported retirement, not a forecast. Original owners, statuses and location accuracy are retained.
JSON downloads contain retained records for the selected country, including records outside the current filters. Complete-explorer CSV downloads contain all covered countries. New source snapshots are checked and reviewed separately before publication.
Source: Global Energy Monitor · CC BY 4.0. Source period: September 2026 release. World Signal Monitor adapted the selection, navigation and maps; no publisher endorsement is implied. File checksums · Source URLs, retrieval dates and hashes